2-5-25 Meeting FWP / WPC

Notes on the meeting

Present:

  • FWP – Julian Wells, Donovan Brock
  • WPC – Michael Hill (Chair), Jean Lambourne, Hugh Glaves, Keith Morris, Andrea Tancred, Tina Higlett (WPC Clerk)
  • Community Working Group – Karen Nunn

Papers:

  • FWP issued/maintained documentation relating to COL (Community Owned Land)
  • gpc Ltd Planting schedule (tabled before the meeting)
  • Community Comments – from 14 April 2025 meeting

Objectives:

  • review documents which form the underpinning of the S106
  • review comments and incorporate them in the COL specification and related documents
  • working towards the draft S106

S106 composition:

  • template as drafted by SNC/FWP
  • supporting elements:
    • BNG documents
    • Soft landscaping plan
    • Water drainage plan (Rossi Long)
    • COL description plan
    • COL specification
    • Commuted Sum
    • Breeden Gravel footpath – spec/plan

Potential timetable

  • June 2025 sign off S106;
  • soon after contractor start on COL;
  • contractor start in 3 buildings’ site; (soon after above)
  • complete (mostly) COL; (after ~6 months?)
  • June 2026 handover/transfer of COL
  • contractor complete buildings

Observations

  • FWP have established an SPV (Special Purpose Vehicle) WDL2 Ltd “Wreningham Development Land Two Ltd” which will feature in the legal documents
  • contractors will work within the bounds of the building site when working on the buildings – this includes vehicle parking; materials storage; equipment stowage
  • Meeting to be arranged with planting agent as soft landscaping work is being undertaken (FWP action)
  • Meeting to be arranged with Ecologist (FWP action)
  • Meeting to be arranged with contractor to discuss COL expectations (FWP action)
  • Commuted sum to be passed to WPC at COL transfer
  • Breedon path specification represented incorrectly in Rossi Long document – membrane to be laid first – see Breedon specification sheet
  • COL spec #33 – agreed no fence on pond #1
  • COL spec #37 – To provide ecologist’s management plan & arrange meeting
  • COL spec #41 – FWP to ensure contracts with new house owners include provision to safeguard COL land from drainage from the 3 plots into E-W drain behind their site
  • Trees planted will be protected from attack by rabbits/deer
  • BNG target – met with ecologist adding 5 further trees to the scheme – location to be decide with COLWG later.

Agreed that

  • Commuted sum to be handed direct to WPC at COL transfer
  • 95% of S106 supporting documents agreed – the few points raised are agreed and will be reflected in revised documents to be issued
  • S106 includes the supplementary documentation identified above.

Post meeting note (23 May 2025)

SNC advise that Birketts not comfortable with representing WPC in the S106 discussions – recommend separate firm of solicitors be contacted.