Anglian Water contractors will be performing routine maintenance to the roadside pots associated with the vacuum sewage system. This will start on 22 October 2018. Each pot will take between 15 and 30 minutes to service. There may be signals/traffic control in use and hence some delays. The roads affected are:
- 22 to 24 October – Ashwellthorpe Road
- 22 to 24 October – Mill Lane
- 23 to 25 October – Wymondham Road
- 24 to 26 October – Church Road
Some more details are available via https://roadworks.org/
Comments are closed