Delays likely - Traffic control (two-way signals) Works location: All Wreningham roads with sewage system Works description: To carry out planned preventative maintenance On 23 Vac Pots. No Excavation. TM supplied by A Plant. Each pot will be worked on separately. Approx 15 min each M/H No excavation. The use of 2 way lights, Give and Take where possible but Temp 15 min delay boards where needed. Access for emergency vehicles pedestrians, and residents. Responsibility for works: Anglian Water Current status: Planned work about to start Works reference: AD00156884346/2
Event Information:
Mon20Apr2020Wed29Apr2020All roads, WreninghamAnglia Water servicing roadside sewage units